
Project Feature: Winterlong Brewing
In 2020, Solvest installed an expansive 192-module solar array on a Whitehorse brewery, effectively utilizing the large roof area. This system significantly reduces the brewery’s energy needs and is the second-largest commercial solar array owned by a Yukon business.
Its East-West orientation enhances power production during early mornings and late evenings. Building on this sustainability initiative, the brewery added a 22kW solar system to their new cold storage facility in 2023.
Location: Whitehorse, Yukon
Project Size: 73.92kW