
Project Feature: Snowline Gold - Forks Camp Project
Solvest designed a custom racking solution for heli-portable battery and electrical equipment, as well as facilitating the transportation of all equipment via helicopter to the remote 45person exploration camp. The power system reduces camp power use by over 80%, resulting in 12,500 litres of fuel savings per exploration season. Na-Cho Nyak Dun Development Corporation is the asset owner and lessor.
Location: Mayo, Yukon
System Size: 27kW